Bio-Pure Technologies
 
  Bio-Pure System Single House Sewage Treatment
  caring for Ireland's environment today
  We specialise in converting existing septic tanks into proper sewage
treatment plants that work.
  As many as four out of ten of the 300,000 septic tanks in Ireland are defective.
When incorrectly installed or working poorly, septic tanks can cause serious
pollution to groundwater resources, and pose a health threat from sewage effluent
seeping into water courses and ground waters without being adequately treated.
Bio-Pure Technologies
Provide high quality single house sewage treatment plant systems for new houses
Specialise in conversion of existing septic tanks into proper, functioning sewage treatment plants
Provide water treatment equipment that complies with EU drinking water standards
Bio-Pure System existing tank conversion Bio-Pure System new house treatment plant
Existing Septic Tank refurbishment

Single house sewage treatment plant
for new house
Bio-Pure System Features
Install into existing septic tank with minimum disruption to the garden
Guaranteed odour free, quiet running
Low electrical running costs (average €40 per annum)
Due to high degree of treatment, effluent can be discharged by surface irrigation to plants and trees
Tank to be desludged on average every five years
High quality, long life components used
Manufactured in Ireland to highest European standards
How The Bio-Pure System Works
The three stages of the Bio-Pure System treatment process is as follows:
Bio-Pure System Stage 1 Aeration Process
Stage One:
AERATION PROCESS
This is where the sewage is Aerobically treated, the sewage is
completely broken down, breaking the solids into small particles.
With Aeration there will be no smell of sewage from the tank.
Duration of Aeration is twelve hours maximum, 9.00a.m to 9.00p.m.
Bio-Pure System Stage 2 Settlement
Stage Two:
SETTLEMENT PROCESS
The aeration process is switched off and the settlement process
begins. All the small particles settle to the bottom of the tank, the
treated effluent moves to the top of the tank.
Duration of Settlement process is six hours max, 9.00p.m to 3.00a.m.
Bio-Pure System Stage 3 Pumping
Stage Three:
PUMPING OF FINAL EFFLUENT
The pumping sequence is timed to come on at 3.00a.m in the
morning. At this stage the final effluent will be of a very high standard.
10mg/litre Biological Oxygen demand 10mg/litre suspended solids.
The final effluent is discharged at sub-surface irrigation.
Technical Details Excavating Hole Details For New Tank
Population Equivalent Served
Maximum Bod Per Day
Design Flow Rate

10 persons
0.6kg
2000 litres per day
2m³ per day
    Bio-Pure System Excavation Dimensions
Treated Effluent Standard
Biological Oxygen Demand
Suspend Solids


10mg/litre
10mg/litre

Electrical Power Supply Required
Power Consumption

220 Volts 1 Phase
60 Watts

New Tank Installation
Material of construction
Overall length
Width
Overall height
Capacity


Surface Area
Weight of Tank
Pre-cast Concrete
2760mm
1400mm
1800mm
1040 gallons
4.8m³

2.5m
3.5 tonnes

        Bio-Pure System Excavation Dimensions
Bio-Pure Technologies New Products & Services
Bio-Pure System For Large Multi-House Developments
A single large Bio-Pure septic tank installation to serve multiple homes.
Renewable Energy Systems
Wood chip pellet burners, wind powered energy. GOVERNMENT GRANTS NOW AVAILABLE!
For further details call 086 1520035 / 086 6002044 or email: biopuretech1@eircom.net
Home Page Download Product Brochures Enquiry Form Top Of Page
 
Bio-Pure Technologies Ltd Delvin Road, Athboy, Meath, Ireland Mobile: 086 1520035 / 086 6002044 Email: biopuretech1@eircom.net Meath Technology