
|
| |
|
| |
Bio-Pure System Single House Sewage Treatment |
|
|
| |
caring for Ireland's environment today |
|
|
| |
We specialise in converting existing septic tanks into proper sewage treatment plants that work.
|
|
|
| |
As many as four out of ten of the 300,000 septic tanks in Ireland are defective. When incorrectly installed or working poorly, septic tanks can cause serious
pollution to groundwater resources, and pose a health threat from sewage effluent
seeping into water courses and ground waters without being adequately treated.
|
|
|
|
|
|
| Bio-Pure Technologies |
|
|
 |
|
Provide high quality single house sewage treatment plant systems for new houses |
|
|
|
 |
|
Specialise in conversion of existing septic tanks into proper, functioning sewage treatment plants |
|
|
|
 |
|
Provide water treatment equipment that complies with EU drinking water standards |
|
|
|
|
|
 |
|
 |
|
Existing Septic Tank refurbishment
|
|
Single house sewage treatment plant for new house |
|
|
|
|
| Bio-Pure System Features |
|
|
 |
|
Install into existing septic tank with minimum disruption to the garden |
|
|
|
 |
|
Guaranteed odour free, quiet running |
|
|
|
 |
|
Low electrical running costs (average €40 per annum) |
|
|
|
 |
|
Due to high degree of treatment, effluent can be discharged by surface irrigation to plants and trees |
|
|
|
 |
|
Tank to be desludged on average every five years |
|
|
|
 |
|
High quality, long life components used |
|
|
|
 |
|
Manufactured in Ireland to highest European standards |
|
|
|
|
|
|
|
|
|
| How The Bio-Pure System Works |
|
|
The three stages of the Bio-Pure System treatment process is as follows:
|
|
|
 |
|
Stage One: AERATION PROCESS |
|
This is where the sewage is Aerobically treated, the sewage is
completely broken down, breaking the solids into small particles.
With Aeration there will be no smell of sewage from the tank.
|
|
| Duration of Aeration is twelve hours maximum, 9.00a.m to 9.00p.m. |
|
|
 |
|
Stage Two: SETTLEMENT PROCESS |
|
The aeration process is switched off and the settlement process
begins. All the small particles settle to the bottom of the tank, the
treated effluent moves to the top of the tank.
|
|
| Duration of Settlement process is six hours max, 9.00p.m to 3.00a.m. |
|
|
 |
|
Stage Three: PUMPING OF FINAL EFFLUENT |
|
The pumping sequence is timed to come on at 3.00a.m in the
morning. At this stage the final effluent will be of a very high standard.
|
|
| 10mg/litre Biological Oxygen demand 10mg/litre suspended solids. |
|
| The final effluent is discharged at sub-surface irrigation. |
|
|
|
|
|
|
|
|
| Technical Details |
Excavating Hole Details For New Tank |
|
Population Equivalent Served
Maximum Bod Per Day
Design Flow Rate
|
10 persons
0.6kg
2000 litres per day
2m³ per day
|
|
 |
|
Treated Effluent Standard
Biological Oxygen Demand
Suspend Solids
|
10mg/litre
10mg/litre
|
|
|
Electrical Power Supply Required
Power Consumption
|
220 Volts 1 Phase
60 Watts
|
|
|
New Tank Installation
|
|
|
|
|
Material of construction
Overall length
Width
Overall height
Capacity
Surface Area
Weight of Tank
|
Pre-cast Concrete
2760mm
1400mm
1800mm
1040 gallons
4.8m³
2.5m
3.5 tonnes
|
|
 |
|
|
|
|
|
|
|
| Bio-Pure Technologies New Products & Services |
|
|
 |
|
Bio-Pure System For Large Multi-House Developments |
|
|
A single large Bio-Pure septic tank installation to serve multiple homes. |
|
|
|
 |
|
Renewable Energy Systems |
|
|
Wood chip pellet burners, wind powered energy. GOVERNMENT GRANTS NOW AVAILABLE!
|
|
|
|
|
| For further details call 086 1520035 / 086 6002044 or email: biopuretech1@eircom.net |
|
|
|
|
|
|
|
|
|
|
|
|